VST Gas Station No. 71

Reconstruction

Project Details

Location

Kryvyi Rih, Ukraine

Project Type

Commercial

REGIBUD’s Role

Project Management

Status

Completed

Project Scale

2,745 m²

Project Overview

This project was delivered by REGIBUD through its own multidisciplinary team, integrating project management, engineering, and construction under a single responsibility.

REGIBUD provided comprehensive project management services during the reconstruction of VST Gas Station No. 71. The project included coordination of contractors, supervision of construction works, quality control, schedule management and support throughout all key stages.
The reconstruction was successfully delivered on schedule and within the agreed budget despite winter weather conditions

  • Development of detailed design documentation, including construction drawings and technical specifications.
  • Major structural reconstruction of the building, including installation of panoramic glazing, reconfiguration of the internal layout, and creation of new openings in load-bearing walls with structural steel reinforcement.
  • Turnkey finishing and fit-out works.
  • Boiler room reconstruction   with replacement of heating boilers, a manifold and water heaters
  • Installation of new building engineering systems, including electrical, plumbing, heating and fire alarm systems.
  • Facade reconstruction, including demolition of the existing facade and installation of a new facade system.
  • External site improvements, including replacement of asphalt pavement and pedestrian paving, installation of illuminated curbs in the client's corporate identity, and construction of a new outdoor lighting system.
  • Maintaining uninterrupted fuel station operations throughout the reconstruction while ensuring safety and efficient project execution.
  • Executing major structural modifications to the existing building, including new openings in load-bearing walls with structural steel reinforcement.
  • Coordinating multiple engineering disciplines within a compressed construction schedule.
  • Managing procurement and costs under a fixed-price contract despite significant fluctuations in material prices.

The reconstruction of VST Gas Station No. 71 was successfully completed in accordance with the approved design documentation, on schedule and within the agreed budget.

The project delivered a modernized fuel station with upgraded engineering systems, a redesigned facade, improved functionality and a fully renovated surrounding area.

Throughout the one-year warranty period, REGIBUD provided responsive aftercare and fulfilled all warranty obligations, ensuring the long-term reliability and performance of the completed works.